Dean Gale has
provided consulting services on over 50 projects where claims and disputed extra work issues were the subject of litigation,
arbitration, or mediation between the parties. He has conducted analyses of complex construction delay and productivity claims,
performed detailed schedule analyses utilizing CPM schedules, investigated disputed extra work claims, and provided litigation
support services on numerous occasions.
|
|
High Desert
State Prison, California Department of Corrections. $98M project, $20M claim. Reclaimed Water Distribution Pipeline, Northwest Pipe and Casing Company.
$5M project, $480K claim. LA Metrorail
7th and Flower St. Station, Los Angeles County Transportation Commission. $43M project, $29M claim. Santa Monica Municipal Airport Operations Center & Site Improvement
Project, City of Santa Monica. $4.3 M project, $1.5M claim. Friant Hydroelectric Power Plant, CNA Insurance Co. and Tudor Engineering. $30M project, $6.7M
claim. Freeway Interchange Project,
California Department of Transportation. $40M project, $6M claim. Power Control Center Facility, Sacramento Municipal Utility District. $12M project, $2M claim. Pacific Torrey Reserve - Commercial Real Estate Development. $30M project,
$1M claim. Wastewater Treatment Plant
Office and Maintenance Shops, City of San Diego. $5M project, $2.3M claim. Butler Middle School, Ralph Allen Partners and Evanston Insurance Co. $6M
project, $776K claim. LA Metro
Rail, Two Red Line Stations constructed by Tudor-Saliba-Perini, Los Angeles County Transportation Commission. The two stations
had a contract value of over $120M and the claims totaled more than $25M. Sewer Trunk Line Replacement, County Sanitation Districts of Los Angeles County. $3M project,
$500K claim. Canyon Side Community
Park, City of San Diego. $2.5M project, $200K claim. Administration Building and Laboratories for Water Treatment Plant, City of San Diego. $9.6 M project, $300K claim. Alvarado Water Treatment Plant Training Building, City of San Diego. $2M
project, $90K claim. Vista High
School, C.V. Holder, Inc. and Nationwide Insurance. $11 M project, $1 M claim and $2M counter claim. Metropole Hotel, Linkletter Construction Co. $3 M project, $500Kclaim. Hoag Cancer Center, Hoag Memorial Hospital Presbyterian. $13.2 M project,
$3.5M claim. Clairemont Hospital Renovation,
County of San Diego and the Stichler Design Group. $5M project, $1M claim.
|